Building Application Project TUS-HUS Technical Application Responsibility
The abbreviation TUS stands for Technical Implementation Officer. It is a concept that plays an important role in the construction industry, especially before the start of construction of a structure and throughout the construction process.
What is TUS?
TUS is a technical person who is responsible for ensuring that a structure is built in accordance with its project and complies with all relevant legal regulations. The Technical Implementation Officer, who is a Surveying Engineer, takes part in the entire process from the beginning to the end of the construction.
Construction Permit and TUS Relationship
In order to obtain a construction permit, municipalities or relevant institutions are applied to. During this application, a number of documents are requested that show that the technical details in the project are correct and complete. TUS is responsible for preparing and checking these documents.
Project Implementation: TUS ensures that the project is implemented correctly in the construction area.
Compliance with Legal Regulations: It checks the compliance of the structure with all relevant laws, regulations and standards during the construction.
Municipality Control: TUS also takes part in the controls and inspections to be carried out by municipal teams during the construction process.
Duties of TUS
- Project Control: Checking the conformity of the project to the projects during the construction phase.
- Licensing Procedures: Taking part in the process of applying for a construction permit and obtaining other necessary permits.
- Building Control: Checking the building condition at every stage of construction.
- Municipality Relations: Ensuring coordination with municipal teams during the construction process.
Why is TUS Important ?
Legal Compliance: Thanks to TUS, structures are constructed in accordance with legal regulations.
Security: TUS ensures that structures are safe.
Quality: It ensures that structures are of high quality and have a long life.
Responsibility: TUS takes responsibility for solving problems that may arise during the construction process.
In short, TUS is responsible for the technical implementation of a structure during the construction process. TUS's duties are of great importance in obtaining a construction permit and completing the construction in accordance with the laws.
What is Map Implementation Responsibility (HUS)?
Map Implementation Responsibility (HUS) is a document prepared in accordance with the zoning status of the land on which a structure will be built and is required during the implementation phase of the project. This document is prepared by a survey engineer and indicates the physical dimensions, setback distances, elevations and road width of the structure. In short, it is a document containing all geometric information related to the project.
Importance of HUS
Legal Compliance: HUS shows the conformity of the structure to zoning plans and is mandatory for obtaining a construction permit.
Project Implementation: Ensures that the project is implemented correctly on site.
Environmental and Neighborhood Rights: Determines the structure's relationship with the surroundings and neighboring parcels.
Construction Control: A reference point for controls and inspections during the construction process.
Content of HUS
Building Mass Dimensions: Dimensions of the structure such as ground height, width and length.
Setback Distances: Distances of the structure from the boundaries.
Elevation Information: Elevation (height) values at different points of the structure.
Road Width: Width of the road where the structure is located.
Elevation Sketches: Drawings showing elevation status related to the project.
Zoning Status Document: Document showing the zoning status of the land where the structure is located.
Other Documents: Additional documents such as project author commitment, type-2 contract.
HUS Preparation Process
Zoning Status Document: Zoning status document of the land where the structure will be built is obtained.
Project Preparation: Architectural, static and installation projects are prepared.
Preparation of HUS: HUS is prepared by the surveying engineer, taking into account the zoning status document and projects.
Control and Approval: The prepared HUS is checked and approved by the relevant institutions.
Who Prepares HUS?
HUS is usually prepared by freelance surveying engineers. These engineers work within the framework of the relevant legislation and technical regulations.
Benefits of HUS
Fast and Correct Implementation: Thanks to HUS, the project can be implemented more quickly and accurately.
Prevention of Disputes: HUS helps prevent disputes that may arise during the construction process.
Legal Assurance: HUS is proof that the structure was constructed in accordance with the laws.
As a result, Surveying Implementation Responsibility (HUS) is an important document for the successful completion of construction projects. Thanks to HUS, projects can be realized faster, more accurately and more safely.
What is HKMO Type 2 Contract?
HKMO Type 2 Contract is a standard contract type prepared by the Chamber of Surveying Engineers (HKMO) in Turkey and used for the services provided by surveying engineers. It is frequently preferred especially in services such as building application projects (HUS).
Why is a Type 2 Contract Used?
Standardization: It creates a clear framework between the surveying engineer providing the service and the client receiving the service.
Legal Assurance: It prevents possible disputes by determining the rights and obligations of both parties.
Transparency: It provides transparency in issues such as the content of the service, pricing and payment terms.
HKMO Approval: It is a contract type accepted in the sector because it is approved by HKMO.
Scope of Type 2 Contract
Service Definition: The scope of the services to be provided by the surveying engineer is explained in detail.
Pricing: The fee to be received for the service, the payment method and time are determined.
Responsibilities: The responsibilities to be carried by both parties throughout the service process are specified.
Duration: The start and end dates of the service are determined.
Dispute Resolution: It specifies how disputes that may arise between the parties will be resolved.
Importance of Type 2 Contract
For Surveying Engineer: Protects their rights, ensures that their services are provided within a standard framework.
For Customer: Provides clear information on when and how the service will be completed, reduces possible risks.
For Sector: Increases the quality of services, creates an orderly working environment in the sector.
Where to Obtain?
HKMO Type 2 Contract can be obtained from HKMO's official website or branches. The contract is usually in Word format and can be personalized by entering the parties' information.
In summary, HKMO Type 2 Contract is an important document that protects the rights of the parties in surveying engineering services and ensures that the services are carried out in an orderly manner. Thanks to this contract, both the service provider and the service recipient are legally secured.